Service Jetty Berth 1 Modification Works

Project Details

  • Client Pilbara Ports Authority
  • EPCM No
  • Location Port Hedland
  • Duration 3 months
  • Construction Barge

    Construction Barge

Included in the works:

  • Removal and Modification of existing walkway.
  • Removal of existing stepped landing.
  • Survey of existing pile sections.
  • Installation of new piles and pile extensions.
  • Reinstatement of walkway.
  • Manufacture and installation of pontoons.
  • Manufacture of gangway and gangway shore end support.
  • Installation of gangway and gangway shore end support.
  • Blast and paint (existing) modified piles down to barnacle line.
  • Cooperation with PPA appointed third-party inspectors.